List a Job
List an Event
List a Property

OMR Infrastructure Update: New Flyover at Tidel Park, Metro Impact, and Road Repairs

OMR Infrastructure Update: New Flyover at Tidel Park, Metro Impact, and Road Repairs

Old Mahabalipuram Road (OMR) is seeing a mix of new infrastructure openings, ongoing Metro work, and planned road repairs. Here's a collated round-up of what's happening along the IT corridor and how it affects residents and commuters.

New U-Shaped Flyover and Foot Overbridge at Tidel Park

In late February 2025, Deputy Chief Minister Udhayanidhi Stalin inaugurated a second U-shaped flyover and a foot overbridge at the Tidel Park junction on OMR. The flyover spans 510 metres and was built at a cost of around ₹27.5 crore. It allows vehicles from ECR to reach Madhya Kailash without stopping at signals and connects to CSIR Road in Taramani.

A 155-metre foot overbridge with escalators was also opened at an estimated cost of ₹11.3 crore. It connects Thiruvanmiyur MRTS, Tidel Park, and nearby IT companies, making it easier for pedestrians and office-goers to cross OMR safely.

At a glance
• Flyover: 510 m, ~₹27.5 crore; ECR → Madhya Kailash / CSIR Road
• Foot overbridge: 155 m with escalators, ~₹11.3 crore
• Location: Tidel Park junction, OMR

Chennai Metro Phase II and OMR Traffic

Phase II of the Chennai Metro Rail project is affecting traffic and road conditions on OMR. The stretch between SRP Tools and Navalur is especially congested during peak hours. The road surface has deteriorated in several places, and many footpaths have been removed or blocked by construction, making it harder for pedestrians.

Motorists report longer commute times. Once Metro work is fully completed and the remaining stretch is handed over to the Tamil Nadu Road Development Company (TNRDC), a full relaying of the road is planned.

OMR–ECR Link Road Near Sholinganallur

The OMR–ECR link road near the Sholinganallur junction is in poor condition. Construction debris, dust, and a reduced road width are making commutes difficult. The road level has dipped in places due to construction, and there have been reports of accidents, including a motorcycle fall and a car overturn at the SRP Tools junction. Potholes are widespread; some temporary repairs using steel frames have themselves been linked to safety concerns.

Commuter note
Drive with extra care on the OMR–ECR link and around SRP Tools. Expect delays and uneven surfaces until repairs and Metro handover are complete.

5 km of OMR to Be Relaid by September 2025

The Tamil Nadu Road Development Company (TNRDC) plans to re-lay about 5 km of OMR by the end of September 2025. TNRDC has called four tenders worth around ₹40 crore to repair service lanes, correct road levels, and improve drainage. The full road will be completely re-laid once the remaining stretch is handed over to TNRDC after about one-and-a-half years.

Road Widening: Siruseri SIPCOT to Padur

A separate ₹42-crore road-widening project is under way on a 2.5 km stretch between Siruseri SIPCOT and Padur. It is expected to be completed by February 2026 and will ease traffic on this part of OMR.

Broader Infrastructure Concerns on the IT Corridor

A joint inspection of 2,513 buildings on the IT corridor highlighted wider issues: inadequate water and sewage connections, poor road infrastructure, ineffective stormwater drainage, and solid-waste management problems. The area saw severe flooding even with minimal rainfall in 2024, which led to a Chief Secretary-level inspection. Residents have indicated they will take these infrastructure concerns to the State government.

These findings underline that, alongside new flyovers and Metro work, OMR still needs sustained investment in water, drainage, and roads to become a fully resilient corridor.

Summary for OMR Residents

New infrastructure such as the Tidel Park flyover and foot overbridge is improving connectivity and safety. At the same time, Metro Phase II work is causing congestion and damaged roads, especially between SRP Tools and Navalur and on the OMR–ECR link. Planned measures include about 5 km of OMR relaying by September 2025 and the Siruseri–Padur widening by February 2026. Residents can expect a mix of short-term disruption and medium-term improvement as these projects are completed.

Sources: The Hindu, The New Indian Express, Times of India, Live Chennai (February 2025).

More Articles

SIM Binding Rule: How WhatsApp, Telegram Will Change for Indian Users From March 1

SIM Binding Rule: How WhatsApp, Telegram Will Change for Indian Users From March 1

Mar 2, 2026

SIM binding rule from March 1: WhatsApp, Telegram, Signal must stay linked to your SIM. Web sessions log out every 6 hou...

Solid Waste Management Rules 2026: Signal of a Structural Shift in Urban Waste Governance — What OMR Must Prepare For

Solid Waste Management Rules 2026: Signal of a Structural Shift in Urban Waste Governance — What OMR Must Prepare For

Mar 1, 2026

SWM Rules 2026: 4-stream segregation, bulk generator accountability, digital monitoring, landfill limits. OMR IT parks, ...

28.3 Lakh Voters in Chennai for 2026 Assembly Elections: Final Electoral Roll After SIR

28.3 Lakh Voters in Chennai for 2026 Assembly Elections: Final Electoral Roll After SIR

Feb 25, 2026

GCC released the final electoral roll after Special Intensive Revision: 28.3 lakh voters in Chennai for 2026 assembly el...

TAHDCO Invites Applications for BSc Hospitality Course at IHM Taramani (OMR)

TAHDCO Invites Applications for BSc Hospitality Course at IHM Taramani (OMR)

Feb 25, 2026

TAHDCO invites Adi Dravidar and tribal students to apply for BSc Hospitality & Hotel Administration. Eligible students c...

GCC Unveils ₹110 Crore Plan to Revamp Nine Bus Termini in Chennai; Thoraipakkam and Pallikaranai on OMR Among Them

GCC Unveils ₹110 Crore Plan to Revamp Nine Bus Termini in Chennai; Thoraipakkam and Pallikaranai on OMR Among Them

Feb 25, 2026

Greater Chennai Corporation will modernize nine bus termini in 2026-27, including OMR hubs at Thoraipakkam and Pallikara...

Malathi Helen Appointed Chengalpet Collector, D. Sneha Shifts to Kanchipuram: What It Means for OMR Residents

Malathi Helen Appointed Chengalpet Collector, D. Sneha Shifts to Kanchipuram: What It Means for OMR Residents

Feb 24, 2026

Tamil Nadu shuffles collectors: Malathi Helen promoted to Chengalpet Collector, D. Sneha moved to Kanchipuram. Kalaiselv...

View All Articles

Join the MyOMR Community

MyOMR.in is your local news portal and community website for Old Mahabalipuram Road (OMR), Chennai. We bring you the latest news, events, job opportunities, and community updates from the OMR region.

What You'll Get:

  • Latest Local News: Stay informed about happenings in OMR
  • Event Updates: Never miss community events and activities
  • Job Opportunities: Discover local job openings in OMR
  • Community Features: Access to listings, directories, and more
  • Election & Civic Info: Important updates like BLO details, voter information

Subscribe now to receive regular updates delivered straight to your inbox!

Subscribe for Updates

By subscribing, you agree to receive updates from MyOMR.in.
We respect your privacy and won't spam you.

Follow us on: